Solar Panel and Battery Sizing: The Two Numbers Behind Every Failure
Ask a supplier why a solar street light stopped working in the rainy season and the answer is rarely the LED. It is almost always the energy budget: a panel that cannot refill the battery in the worst month, or a battery whose usable capacity was quoted at a depth of discharge the cells will never actually deliver. Solar panel and battery sizing is arithmetic, not marketing, and the inputs are things you can demand from any supplier before you place an order.
This guide walks through the calculation in the same order an engineer would: nightly load, panel harvest, battery autonomy, then the failure modes that appear when any one of the three is cut to win a price comparison. Every number below is either a formula you can apply yourself or an assumed input to a worked example. Qichenshop does not publish a universal autonomy figure, because autonomy depends on your site irradiance, your lighting schedule and your winter or monsoon weather, not on a catalogue headline.
Step 1: Calculate the Nightly Energy Demand
Start from the load, never from the panel. A solar street light does not run at nameplate wattage all night: it runs a schedule, usually full output for the early evening traffic peak and a reduced level after midnight. The number that matters is watt-hours consumed per night.
Nightly energy in watt-hours equals the sum, over each dimming stage, of stage power multiplied by stage duration. Add the controller standby draw, which is small but not zero. If you are still deciding the wattage itself, our wattage, pole height and spacing guide explains how lumens, pole height and spacing set the power class before any panel is chosen.
Sizing input
Symbol
Where to get it
Why it changes the answer
Luminaire power per dimming stage
P
Datasheet, per stage not just maximum
A dimming profile can cut nightly energy by 40 percent or more
Stage duration
t
Your lighting schedule or the tender specification
Road authority schedules vary widely between projects
Nightly energy demand
E night
Sum of P x t across all stages
The single figure every other step is built on
Controller standby draw
P standby
Controller datasheet
Matters on small systems with long daylight storage periods
Worst-month peak sun hours
PSH
Solar irradiance data for the exact site
Annual averages hide the month that causes the failure
Two schedule details are routinely skipped in quotations. First, whether the luminaire follows dusk-to-dawn by photocell or a fixed timer: a fixed timer burns energy before sunrise in summer and after sunset in winter, and the difference is real watt-hours. Second, how the motion sensor behaves. Microwave radar sensing that boosts output on detection saves energy only if the resting level is genuinely low, which has to be written into the schedule rather than assumed.
Step 2: Size the Panel for Recovery, Not Just Daily Balance
Panel output in watt-hours equals panel wattage at standard test conditions multiplied by peak sun hours, then multiplied by a system derate factor. The derate is where optimistic quotes quietly disappear: cell temperature, dust and soiling, wiring losses, module mismatch, and the efficiency with which the controller pushes charge into the battery all take a share.
Derate factor
Typical effect
How it is controlled in a street light
Cell temperature
Lower output once module temperature climbs well above 25 C
Air gap behind the module, avoid mounting flush on a hot surface
Dust, soiling and bird droppings
Largest single loss in dry and harmattan seasons
Tilt angle, cleaning interval in the O&M plan
Wiring and connector loss
Small but permanent
Correct cable gauge, sealed connectors, short runs
Charge efficiency into the battery
Lithium holds most of what it receives; lead-acid loses more, especially at partial charge
The mistake is sizing the panel so that it exactly covers the nightly load in an average month. That panel has zero surplus, so any deficit created during a run of overcast days is never repaid. The battery walks down day by day, the low-voltage disconnect starts cutting the light off at 02:00, and by the third week the site looks like a product failure when it is a sizing failure.
Size the panel so that a normal sunny day produces a surplus over the nightly demand. That surplus is what refills the battery after bad weather. A margin in the range of 20 to 30 percent above the daily balance is common design practice, and it must be calculated on worst-month peak sun hours, not on the annual average.
Step 3: Size the Battery for Autonomy and Depth of Discharge
Battery nominal capacity equals nightly energy multiplied by autonomy days, divided by usable depth of discharge and by round-trip efficiency. Autonomy is the number of consecutive no-sun days the site must survive, which is a project decision: two nights is common for distributor stock systems, three or more is normal for cyclone and monsoon regions where overcast spells run long.
Depth of discharge is where quotations become creative. A lithium iron phosphate pack can be cycled deeply, but the capacity you can actually draw before the low-voltage disconnect opens is still less than nameplate. A lead-acid pack quoted at 100 percent depth of discharge is quoting a number that shortens its life every time it is used. Both cases have the same outcome: fewer usable watt-hours than the buyer assumed, and a shorter autonomy window in the season that matters.
Lithium packs also need the low-voltage disconnect configured for the actual chemistry, not inherited from a lead-acid default. A disconnect set too low protects nothing; set too high, it turns a healthy pack into a light that switches off early. This setting belongs in the datasheet, next to the charge profile.
A Worked Example, With the Assumptions Stated
The table below applies the three steps to an assumed project. It is a demonstration of the method, not a specification of any Qichenshop model: the load, the irradiance and the autonomy target are all inputs you would supply from your own site.
Parameter
Value in this example
What it shows
Luminaire and schedule
40 W, 4 hours at full output plus 8 hours at 35 percent
Dimming profile cuts demand to roughly 40 percent of full-night operation
Nightly energy demand
272 Wh
160 Wh plus 112 Wh, plus controller standby
Worst-month peak sun hours
3.0 h
Taken from site data for the cloudiest month, not the annual average
System derate
0.72
Temperature, soiling, wiring and charge efficiency combined
Panel sized to daily balance only
126 W
Covers 272 Wh with no surplus at all
Panel sized with a 25 percent recovery margin
160 W
About 346 Wh per sunny day, roughly 74 Wh surplus
Battery for 2 nights at 80 percent usable depth
About 738 Wh, so a 12.8 V 60 Ah class pack
Uses usable capacity, not nameplate capacity
Time to refill after two overcast nights
Around 7 sunny days at 160 W
Long, which is why the margin and the dimming profile both matter
Time to refill at 126 W
Effectively never
Surplus is close to zero, so the deficit is permanent until the weather changes
One honest conclusion from that table: even a correctly sized system recovers slowly from a long overcast spell. That is why experienced operators combine three levers rather than one. They add panel margin, they set a lower standby level after midnight, and they accept that a dimmed light for two weeks beats a dark pole for two weeks. A supplier who promises full output through any weather without stating irradiance and autonomy assumptions is guessing.
Why Undersized Panels Fail in Cloudy Season
The failure is a chain, not an event. Diffuse light under cloud reduces harvest, the panel spends the day trying to refill a pack that never quite reaches absorption voltage, the controller sees a voltage that looks charged and throttles back, and the battery enters every night slightly below where it started. On lead-acid that chronic partial state of charge sulphates the plates; on lithium it drifts the cells out of balance and the BMS eventually cuts the pack early.
Symptom reported by the site
Root cause in the sizing
What to fix
Light dims or cuts out around 02:00 during rainy weeks
Capacity quoted at nameplate, not usable depth of discharge
Re-specify on usable watt-hours and confirm the low-voltage disconnect
Output fine in year one, noticeably weaker in year two
Chronic partial state of charge degrading the pack
Panel margin plus chemistry review, not just a battery replacement
Works after one cloudy day, fails after three
Autonomy counted on paper rather than on usable energy
Set autonomy days explicitly and test against them
Panel looks adequate on the datasheet
Peak sun hours taken from annual average instead of worst month
Rebuild the calculation on worst-month irradiance for the site
Dust deserves a separate mention because it fails systems that pass every cloud-season test. In dry-season and harmattan conditions a soiled module can lose a meaningful share of its output, and the loss is invisible in a quotation. Tilt angle and a stated cleaning interval are part of sizing, not part of housekeeping.
The Ratio Trap: Panel Watts Against Battery Watt-Hours
A quick sanity check when comparing offers: divide panel wattage by battery watt-hours and multiply by your worst-month peak sun hours and derate. If the result is not comfortably above your nightly demand, the package cannot sustain itself regardless of how the brochure describes it. A generous battery paired with a small panel is the most common shape of an undersized design, because the battery is the line item buyers compare and the panel is the line item they ignore.
This is also why a “bigger battery” upgrade does not fix a weak panel. Extra capacity buys autonomy days once, then hands you a larger deficit to repay. When you put two quotes side by side, normalise on panel wattage, usable battery watt-hours, controller type and the stated autonomy at a stated irradiance. Our guide to how to compare quotes fairly walks through the rest of the comparison grid.
What to Put in Your RFQ
Nightly energy demand in watt-hours, with the dimming schedule you actually want, not an assumed 100 percent all night.
Worst-month peak sun hours for the project coordinates, and the autonomy days required through the monsoon or cyclone season.
Panel wattage, module type, tilt angle and mounting method, including how the module is ventilated behind the frame.
Battery chemistry, nominal voltage, usable watt-hours, depth-of-discharge limit and the configured low-voltage disconnect point.
Controller type and rated charge current, plus the charge profile written for the chemistry supplied.
Whether the quoted autonomy figure is calculated at your irradiance or at a headline condition.
Control configuration belongs in the same document. Our luminaires ship with dusk-to-dawn photocell control, timer scheduling and microwave radar motion sensing as standard, and those modes are what make a dimming schedule enforceable. Higher-level smart city integration, including NEMA or Zhaga sockets and Wi-SUN mesh networking, is optional or customizable integration rather than standard equipment.
What Qichenshop Provides
Qichenshop (Jiangmen Qichen Lighting Co., Ltd.) has manufactured solar lighting since 2010 and was first registered as Zhongshan Qichen in 2013. Each model is documented with its panel wattage, battery chemistry and capacity, controller type and supported load control modes, so you can run the three steps above against real configuration data instead of a marketing summary. Where a project needs an autonomy figure for a specific site, we calculate it from your irradiance and schedule and state the assumptions in writing.
The A21 all-in-one solar street light is documented with its panel and battery configuration for projects that need the compact all-in-one format, while the A01 split solar street light separates panel, battery and luminaire so each can be sized independently on difficult sites. All outdoor luminaires are rated IP65 and backed by a 5-Year Limited Warranty.
Working With Qichenshop
Minimum order quantity starts from 50 units, with payment terms of 30 percent T/T deposit and 70 percent balance before shipment. Standard production lead time is typically 15 days, and customized configurations run 15 to 25 days. Quotations are valid for 30 days. Our sample programme is USD 50 for OEM and USD 300 for ODM plus freight collect, refundable against a first order of USD 1,000 or more.
Send your project coordinates, lighting schedule and required autonomy days through contact Qichenshop, and we will return a sizing sheet with the panel, battery and controller figures written out so your engineer can check the arithmetic.
To provide the best experiences, we use technologies like cookies to store and/or access device information. Consenting to these technologies will allow us to process data such as browsing behavior or unique IDs on this site. Not consenting or withdrawing consent, may adversely affect certain features and functions.
Functional
Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferences
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes.The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.